Virta wins design/supply order for new ore and filtered tailings conveyors at Peru gold mine expansion

Virta was awarded the design and supply of six plant conveyors, two radial stackers and four belt feeders for a new ore and filtered tailings circuit expansion at an existing gold ore crushing and screening facility in Peru. The project is underway with equipment and steel deliveries planned through the end of 2022.